At Tuesday’s Interstate Bridge Replacement Program meeting of the Executive Steering Group, new visualiza ...
-
IBR releases new bridge visualizations as program gets pushback at two meetings
IBR releases new bridge visualizations as program gets pushback at two meetings
-
Opinion: Why spend $200 million on consultants for “basically the same project”?
Opinion: Why spend $200 million on consultants for “basically the same project”?
-
Northern Connector to provide both a tunnel and a new bridge over the Willamette River
Northern Connector to provide both a tunnel and a new bridge over the Willamette River
-
Tunnel model for Interstate crossing exposes more IBR flaws
Tunnel model for Interstate crossing exposes more IBR flaws
-
POLL: Is an Immersed Tube Tunnel a viable option for crossing the Columbia River?
POLL: Is an Immersed Tube Tunnel a viable option for crossing the Columbia River?
-
Is a tunnel actually viable for crossing the Columbia River?
Is a tunnel actually viable for crossing the Columbia River?
-
POLL: Who should pay for the maintenance and operations of the proposed light rail extension into Vancouver? TriMet? C-TRAN?
POLL: Who should pay for the maintenance and operations of the proposed light rail extension into Vancouver? TriMet? C-TRAN?
-
TriMet wants $21.6 million a year for IBR light rail operations
TriMet wants $21.6 million a year for IBR light rail operations