The I-5 river bridge package is at roughly 30% design, meaning final construction drawings and final pric ...
-
Letter: ‘That is why the process matters’
Letter: ‘That is why the process matters’
-
Letter: Buyer beware (caveat emptor)
Letter: Buyer beware (caveat emptor)
-
Letter: Present bridge plan has been in the expensive and unworkable planning stage far too long with no real end in sight
Letter: Present bridge plan has been in the expensive and unworkable planning stage far too long with no real end in sight
-
Letter: ‘IBR I-5 Bridge space allocation grossly unfair’
Letter: ‘IBR I-5 Bridge space allocation grossly unfair’
-
Letter: ‘This is the worst thing that ever happened to the region’
Letter: ‘This is the worst thing that ever happened to the region’
-
Letter: Vancouver Mayor Anne McEnerny-Ogle makes several serious and incorrect engineering statements
Letter: Vancouver Mayor Anne McEnerny-Ogle makes several serious and incorrect engineering statements
-
Letter: The Interstate Bridge Replacement Program must solicit a design-build bid
Letter: The Interstate Bridge Replacement Program must solicit a design-build bid

