
New hybrid signal improves safety and access for people who walk across SR 503
VANCOUVER – People who walk or roll will soon have a safer way to cross State Route 503 in Vancouver with the help of a new signal and crossing location.
Starting Monday, Jan. 6, Washington State Department of Transportation contractor crews will begin building a pedestrian hybrid signal on SR 503. A hybrid signal, also known as a High intensity Activated crosswalk or HAWK, will make it safer and easier for people to cross the road to and from Prairie High School and the nearby transit stop.
What to expect during construction
Travelers on SR 503 near Prairie High School and Northeast 119th Street should plan for single lane closures overnight from 8 p.m. to 10 a.m. Work will happen on weekdays only. Crews will also close the sidewalks and shoulders. Pedestrians will use marked detours in the closed lane to continue moving safely along the roadside while the sidewalk is closed.
Background
On Jan. 6, 2023, a vehicle struck and injured a 14-year-old student as they crossed SR 503 near the school. The student was not at a marked crossing. After this, WSDOT worked with the school to do pedestrian surveys to find the best location for a safer crossing. The new signal will be built just south of Northeast 116th Street, east of the high school. It will also include a refuge island where pedestrians can pause safely in the middle of the road before continuing across the highway which is used by 29,000 vehicles each day.
What is a pedestrian hybrid signal?
A pedestrian hybrid signal is a traffic light that helps people cross a road more safely and visibly. This reduces the risk of crashes for everyone on the road, no matter how they choose to travel. Unlike traditional traffic lights, the hybrid signal only turns on when a pedestrian presses the button. If no one is crossing, drivers can keep moving.
The signal uses red and yellow lights. When the yellow lights are flashing, drivers should prepare to stop. A solid yellow light indicates drivers should begin stopping. Solid red means drivers must stop and wait for people crossing the road. When the light is flashing red, drivers must stop and can only continue when it’s safe for everyone, making sure no pedestrians are crossing.
This $1.1 million project is expected to be finished by February. The work is being done by Northeast Electric LLC.
Also read:
- Letter: John Braun for Congress – Navy captain, business leader, and state senatorDespite worsening congestion, hurting freight, and raising tolls, Perez supports the IBR bridge plan. John Braun looks for affordable, sensible modifications.
- Trail and access closures begin soon at Lacamas Regional Park for bridge replacement projectTrail closures at Lacamas Regional Park run August through November during a bridge replacement project in the northeast corner.
- Letter: Local politicians have ignored repeated votes against light rail and a county resolution opposing light railClark County voters rejected light rail in 2012 and again passed a 68% advisory vote against it in 2013 — but the fight continues.
- Opinion: C-TRAN outpaces TriMet – Strong finances and growing ridership, but a cautionary note on costs and efficiencyC-TRAN’s farebox recovery has dropped from 17% in 2017 to just 4.2% in 2025, even as reserves top $201 million.
- Southbound I-5 to I-205 connection closes for paving work in Vancouver July 10-11The ramp from southbound I-5 to southbound I-205 at Exit 7 closes Friday night for pavement repairs and striping work.






